Do a good job in wall decoration, supervise the wo

2022-07-22
  • Detail

In order to save money, many owners will choose the form of half package decoration. Whether half package or full package, it is indispensable for the owners to check regularly in person when the decoration company enters the site. Xiaobian reminds the owner to grasp the following precautions and not to take the wrong road of decoration

first, the grass-roots construction supervisor should do a good job in decoration

the grass-roots construction is the foundation of all construction. The construction of the grass-roots is done well, so that the subsequent processes are more smooth, and the decorated wall surface is more durable and beautiful. As an owner, do you know a little about basic construction? Let's have a look

1. Slotting precautions

when adding water pipes and wires, slotting on the wall should not be thrown horizontally, but vertically, because the horizontal throwing has great damage to the wall, seismic resistance and strength, so it can only be thrown vertically, and the length of the horizontal throwing should not exceed 3-5 cm. If the groove is deep, it is easy to touch the reinforcement in the wall and cut it off. If the groove is shallow, it will be easy to bulge in the future

2. Material inspection

first of all, we should pay attention to whether the foreman has the behavior of stealing the beam and changing the column, or hand over the materials provided by the company, and then fill the blank with other purchased materials. Once there is a problem, the maintenance and after-sales will be involved. In addition, materials are placed by category to avoid pollution. Regular decoration companies generally place the project schedule and supporting tools in a prominent position, and the decoration site is also relatively clean. Decoration materials should be placed in categories, and materials that are easy to pollute each other should be placed separately

3. Crack prevention inspection

wall works often run through the whole process of decoration construction. If there is woodwork or modeling of the wall, it will enter in the early stage of construction. If it's just paint painting, the operation will start in the middle and late stage. However, for the construction of the wall, the painting often goes through many processes, such as puttying, polishing, painting top coat, primer and so on. If it is not carried out in strict accordance with the construction specifications, if the painting is not in place, or if the next process is carried out without waiting for the previous process to dry out, it is easy to have wall cracks, cracks and other phenomena

small editor's advice: the placement of materials cannot change the physical properties of materials, cause mutual pollution of materials, cause deformation of materials, cause potential safety hazards, and cause package damage. For example, ceramic tiles cannot be placed on sand and cement, and barrels with paint and coating can not be placed on plates

second, the supervisor of wall painting is bright, and the appearance is painted.

wall decoration is facade decoration, which can be decorated by plastering, whitewashing, painting, inlaying, screen hanging and other methods. Especially for the painting supervisor of the wall, the owner should be more cautious, mainly from the following four aspects

1. Check the construction of foundation works

the wall works often run through the whole process of decoration construction. If there is woodwork or modeling of the wall, it will enter in the early stage of construction. If it's just paint painting, the operation will start in the middle and late stage. However, for the construction of the wall, the painting often needs to go through many processes, such as puttying, polishing, painting top coat, primer, etc. if it is not carried out in strict accordance with the construction specifications, if the painting is not in place, or if it does not wait until the previous one

2. Material inspection

painting the wall involves the whole house, so the quality of the paint affects the whole home environment and human health. For example, when choosing latex paint, do not choose one with too poor quality, because it is easy to cause uneven color and other decoration problems. Emulsion paint should be mixed with water, so the concentration should be moderate, too thick or too light is not suitable

3. Inspection of painting process

the inspection of painting process is also related to the quality of wall painting. For example, when applying putty, the putty should be applied at least three times, and each time the putty should not be too thick, and each time it must be completely dry before it can be applied again. If you start painting emulsion paint before it is completely dry, then it is easy to crack the wall in the future. After puttying, the entire wall surface needs to be repaired and leveled with sandpaper. If the wall surface is not flat enough, the latex paint painted will appear deep and shallow, which is very unsightly. When painting emulsion paint, the large surface should be rolled with a roller brush, and the corners should be brushed with a brush, and it should be brushed at least 3 times, and each time it should be brushed again after it is completely dry

small editor's advice: at any time, safety and quality issues are inseparable. When decorating, there should be none less. Carefully check and eliminate potential safety hazards. If any potential safety hazards are found after entering the construction site, it shall be reported to the responsible foreman in time and the decoration company to ensure that there are no safety problems on the construction site

III. the ceramic tile paving supervisor pastes the perfect wall

many people like to run to the construction site every day when decorating, but after all, we are not professionals and have no experience, so we don't know what to see. In fact, the decoration site can directly reflect the advantages and disadvantages of the construction quality, especially the details related to the decoration quality can be reflected one by one in the construction site. Careful examination of these links can not only test the construction quality of workers, but also find the problems in the decoration in time and prevent them from happening

1. Wall treatment inspection

wall treatment should be carried out first when tiling. Wall treatment mainly includes: first, the base course should be cleaned before tiling., Be sure to clean the decorations on the wall or the dirt on the ground, otherwise the cement mortar will not bond firmly with the base. In addition, if the wall has cracks, it should be properly treated before tiling; Secondly, the wall tiles have a high moisture content. Before tiling, the base course should be fully watered and wetted, and the tiles should also be soaked in water for at least 20 minutes before use. At last, the bricklayer must draw a line and use a level to control the quality

2. Material inspection

check whether the practical tiles are consistent with those on the list, and check whether the construction personnel handle the tiles correctly. The correct treatment methods are: (1) stack it in a dry and ventilated place away from open fire; (2) Tiles must be fully soaked before use

3. Construction materials and material handling inspection

to reduce the loss of ceramic tiles, we must grasp the whole process. As for ceramic tiles, consumers had better buy qualified products and agree on replacement conditions with merchants, such as whether they can make up, return, replacement, claim conditions and responsibilities, and know how to deal with problems once they occur; In addition, the size of ceramic tiles should also be considered when purchasing. In order to avoid the loss of tiles, we have to supervise the work. Once it is found that the workers cut the tiles and threw them aside, or broke them, they have to ask clearly to prevent the workers from wasting them at will

4. Construction quality supervision

during the decoration process, many owners will worry about whether the decoration project is carried out smoothly and whether the construction quality of the decoration company is guaranteed. They will always unconsciously go to the decoration site to supervise the work, but if you don't know how to supervise the work, even if there is a problem on the site, you won't see it. The following small editor will solve the two main points of personal supervision for you: first, observe the responsibility and self-confidence of the decoration construction team.; Second, observe the on-site management ability of the decoration company

small editor's trick: if the wall is a rough cement wall, you can paste tiles directly after roughening on the wall. If the wall has been troweled, you must shovel off the wall before tiling, expose the cement base, and then roughen the wall with cement before tiling. The purpose is to increase the hanging degree of cement mortar and the wall to prevent falling off

南宁皮肤病医院

广州男科医院

合肥精神医院

珠海男科医院

Copyright © 2011 JIN SHI